800-257-3526 | contact us Product Selector

Long Lead NTC Epoxy Thermistor (HT Series)

HT Series

HT Series

    Benefits
  • The lead is longer than the HP lead and is without tiebar.
If you can't find what you need, please Contact Us or email us: sales@selcoproducts.com to learn more.

HT series thermistors have epoxy encapsulated bead dimensions of 0.157” x 0.157”, have an operating temperature range from -50°C to 110°C, are available in numerous base resistances and Betas, can be supplied with tolerances from ±1.0% to ±5.0% at 25°C, with un-insulated leads, and are available with an overall length of 1.18”. RoHS Compliant.

Click for larger image.

HT Series Line Drawing
HT Series Line Drawing
HT Series Ordering Map
HT Series Ordering Map

Thumbnail

Name

Item #

Description

Ht 01

HT series thermistors have epoxy encapsulated bead dimensions of 0.157” x 0.157”, have an operating temperature range from -50°C to 110°C, are available in numerous base resistances and Betas, can be supplied with tolerances to ±1.0% at 25°C, with un-insulated leads, and are available with an overall length of 1.18”.  RoHS Compliant.  Click on the “Learn More” button for more information.

Find a Product

Can’t Find the Product You’re Looking For?

Talk to a Sales Expert Today. 800-257-3526